Applied Digital closes $300 million bridge facility; cash draws remain conditional
조회수 확인 중 · Loading views
Country / region: United StatesTopic reference photo. Not a photograph of the reported event.Pexels ↗
The 364-day loan supports Delta Forge 1 construction, but the company expects to seek further financing to complete the campus.
Applied Digital, listed on Nasdaq as APLD, announced the closing on November 23 of a US$300 million senior secured bridge facility for its Delta Forge 1 AI data-center campus in Louisiana. The facility is a delayed-draw term loan. Closing the financing agreement does not establish that the full amount has already been drawn or that construction is complete.
The loan matures in 364 days and bears SOFR plus 300 basis points, meaning the benchmark rate plus three percentage points. Draws depend on conditions including construction milestones, regulatory approvals such as state approval of electricity rates, lender consents and financial covenants. Project assets secure the loan, which may be prepaid without a premium. The company says the campus has a long-term lease with an investment-grade U.S. hyperscaler, but does not identify that customer or the leading lender in this release.
bridge facility
Temporary financing intended to cover a funding gap. This facility has a 364-day maturity, conditional draws and project collateral; closing does not prove that all cash has been drawn.
SOFR is an overnight U.S. Treasury-secured borrowing-rate benchmark. The loan adds 300 basis points, or 3 percentage points, to it; this is a floating formula, not a fixed 3% total rate.